Head Office
Zirax Limited
14 Old Queen Street
London SW1H 9HP
England


Home - Products & Solutions - Oilfield Chemicals - Completion and workover - Fluid loss pill (Plastirox)

Fluid loss pill (Plastirox)

Zirax oilfields chemicals


Fluid loss pill for well completion.

To prevent fluid filtration during well completion, a fluid loss pill Plastirox is injected into the filter interval. A low-permeability filter cake forms on the inner surface. The filter cake prevents the loss of fluids into the formation, eliminates well control problems and preserves the reservoir properties for the required time.

After completing the operation, the filter cake and fluid loss pill are easily removed from the filter surface with minimal depression caused by the formation fluid. Removing the filter cake does not require any breakers (but possible, if necessary).


© Zirax Limited All Rights Reserved. | Privacy Policy – Disclaimer | Site Map Support - Round Cube Studio